This is only a preview of the May 2009 issue of Silicon Chip. You can view 31 of the 104 pages in the full issue, including the advertisments. For full access, purchase the issue for $10.00 or subscribe for access to the latest issues. Articles in this series:
Items relevant to "Dead-Accurate 6-Digit GPS-Locked Clock, Pt.1":
Items relevant to "230VAC 10A Full-Wave Motor Speed Controller":
Items relevant to "Precision 10V DC Reference For Checking DMMs":
Items relevant to "Input Attenuator For The Digital Audio Millivoltmeter":
Purchase a printed copy of this issue for $10.00. |
SILICON
SILIC
CHIP
www.siliconchip.com.au
Publisher & Editor-in-Chief
Leo Simpson, B.Bus., FAICD
Production Manager
Greg Swain, B.Sc. (Hons.)
Technical Editor
John Clarke, B.E.(Elec.)
Technical Staff
Ross Tester
Jim Rowe, B.A., B.Sc
Mauro Grassi, B.Sc. (Hons), Ph.D
Photography
Ross Tester
Reader Services
Ann Morris
Advertising Enquiries
Glyn Smith
Phone (02) 9939 3295
Mobile 0431 792 293
glyn<at>siliconchip.com.au
Regular Contributors
Brendan Akhurst
Rodney Champness, VK3UG
Mike Sheriff, B.Sc, VK2YFK
Stan Swan
SILICON CHIP is published 12 times
a year by Silicon Chip Publications
Pty Ltd. ACN 003 205 490. ABN 49
003 205 490. All material is copyright ©. No part of this publication
may be reproduced without the written consent of the publisher.
Printing: Hannanprint, Noble Park,
Victoria.
Distribution: Network Distribution
Company.
Subscription rates: $89.50 per year
in Australia. For overseas rates, see
the order form in this issue.
Editorial office:
Unit 1, 234 Harbord Rd,
Brookvale, NSW 2100.
Postal address: PO Box 139,
Collaroy Beach, NSW 2097.
Phone (02) 9939 3295.
Fax (02) 9939 2648.
E-mail: silicon<at>siliconchip.com.au
ISSN 1030-2662
* Recommended and maximum price only.
2 Silicon Chip
Publisher’s Letter
High-speed broadband network
could be a white elephant
So the Federal Government has proposed a completely
new optical fibre broadband network. Whoopee! All
those people who are dissatisfied with their present
internet connections will no doubt be salivating at the
prospect of such a high-speed, high capacity network?
Or will they? And what will they use it for?
In the days after the initial release there have been
numerous questions raised about the huge projected cost
to build it, its overall coverage of the population and the
projected monthly charges. At the time of writing this editorial, there is simply not
enough detailed information to make an informed comment. Nor has any of the
enabling legislation been drawn up and nor do we know if it will be passed in its
proposed form or whether it may be changed so much that the result bears little
resemblance to the original proposal.
But in spite of the lack of detail, there are a number of concerns that do need to be
addressed before the project gets too far down the track. The first question revolves
around the huge projected cost of $43 billion, which is an order of magnitude larger
than the $4.7 billion government contribution to the originally proposed broadband
tender. This means that the project will have enormous financial costs even before
a single customer has signed up. It also means that the monthly charges will need
to be quite high, perhaps as high as $150 to $200 according to some analysts. You
would need to be a very committed user to pay that much.
Second, we would need to be assured that there would be no significant differences between download and upload speeds, as there are with the present broadband
system. Fast download speeds are all very well if you are downloading movies but
business wants fast upload speeds as well, for a wide range of applications.
Third, there is a big question over whether we need a fibre-optic network at all,
in addition to the existing cable networks. With the ever-increasing speeds available from wireless networks, why have another cable network running down the
streets of the nation. And is the new fibre-optic network likely to be above ground,
like the present Optus network? Surely not! Many developing nations are choosing to bypass conventional wired networks for phone and internet and have gone
straight to wireless systems.
Overall, I have a very bad feeling concerning this plan. Is it likely to be another
financial disaster like the 1980s PayTV debacle? Is the government trying to come
good on an election promise when it should quietly leave the whole field to private enterprise? And are we going to end up with another government-sponsored
monopoly like Telstra was?
Finally, if the government is all that keen to build big infrastructure projects, why
not build something really tangible such as the long-proposed Very Fast Train (VFT)
project? This would not only provide a very important high-speed link between the
eastern state capitals of Brisbane, Sydney, Canberra & Melbourne but would also
help reduce Australia’s oil import bill and thus the balance of payments. It would
also reduce our overall greenhouse gas emissions – something which is supposedly
a big concern to the Federal Labor Government.
In suggesting the Very Fast Train project, I am mindful of the pitfalls of such
government-sponsored infrastructure such as the Alice Springs to Darwin railway
which is over-burdened with debt. However, the VFT project would potentially
serve a very large population along its proposed route and there would be countless benefits apart from the railway itself.
Leo Simpson